WE HAVE A NEW
/ NEVER USED 500 M/W POWER STATION FOR SALE.
THIS MASSIVE SYSTEM WOULD RUN A CITY WITH OVER 500,000
+ PEOPLE IN IT.
THE POWER STATION IS BOXED UP READY TO BE SHIPPED.
PRICE US$170M AS IS WHERE IS BASIS. IT IS LOCATED IN
USA
THIS IS A VERY GOOD PRICE!!
A NEW ONE TODAY WOULD COST IN THE REGION OF US220M AND
WOULD TAKE ABOUT 5-YEARS TO MANUFACTURE. PLEASE NOTE,
THAT SELLER WILL NOT ENTERTAIN ANY BUYER, WITHOUT SEEING
FINANCIAL CAPABILITY BY WAY OF BANK TO BANK COMFORT
LETTER, BEFORE ANY NEGOTIATIONS COMMENCE.
Scope of Supply:
Gas Turbines
2 Siemens Westinghouse V84.3A(2) gas turbine generators
Gas fuel only
Pulse Filter House Design
Auxiliary systems/equipment
“Containerized Controls/Protection Equipment
Indoor configuration no enclosures provided
TEWAC Generator
Special Tools
Steam Turbine
Triple Pressure Reheat Cycle Design
“Barrel‚ type HP/IP Configuration
Side Exhaust
Auxiliary Systems
Containerized Controls/Protection Equipment
Interconnecting Lube Oil/Hydraulic Oil Piping
Interconnecting cabling per Siemans Standard Arrangement
TEWAC Generator
Special Tools
Heat Recovery Steam Generator
Triple Pressure Reheat Design
Harp Design (Field erected panels w/harp assemblies
inserted via monorail)
Duct firing Capability (Approximately 100 mmbtu capacity)
Space & Rack for CO Catalyst
SCR for NOx Reduction (approximately 90%)
30 foot exhaust stack
Ladders & Platforms
Interconnecting piping
Instrumentation
Drum Level Controls (by others)
electrical (by others)
Condenser
Two Shell, Two Pass, non-divided water box
Titanium tubes and titanium clad tube sheet
Technical Field Assistance for Installation & Commissioning
Emissions Testing/Performance Testing (In conjunction
with the EPC) 4 week trainin
|